特级免费毛片-特级毛片在线观看-特级毛片在线-特级毛片永久久免费观看-特级毛片一级美国黑人-特级毛片网站

E-Mail: [email protected] | Hotline:0760-22601408
Home > News >>  News center
Automatic winding machine inspection before the operation
Date:2019-09-24 08:14:38 Click:
 

Frist, fully automatic winding machine, winding machine and auxiliary equipment inspection and maintenance

1. Inspection and maintenance of horizontal winding machine

1) Always check the lubrication of all moving parts, ensure good lubrication.

2) Always check all parts of fastening bolts loose to timely discovery tightened, especially tailstock foot bolts must be solid and reliable.

3) when the machine is rotated, the following operation is not allowed in the winding.

4) work, always check the disk, whether the top bend and fracture phenomena tailstock, identify problems and timely repairs.

5) when the machine is rotated, does not allow for commutation, speed shift and other operations.

2. Inspection and maintenance of vertical winding machine

1) Check the winding machine and winding butted whether faceplate bolts have been tightened, otherwise it must be re-tightened.

 2) Power Winder is damaged, such as insecurity, if it should be ruled out.

3) Check the telescopic retractable cover is good, and adjust the size of the opening and closing the distance to the faceplate or wound around the outer diameter of the winding 150ram, in order to ensure safe operation. Around

4) Check whether the strap winder or interfere with the operation of the tooling or other objects, or should be arranged in line reconnection position tray and other tooling objects.

The above content after check, can start winding machine winding operation.

SecondInspection and maintenance of winding clamping machine and the assembled rack.

1) Lift the system is working properly, if there is stuck, tilted fault stall or unsafe factors, should ask the professionals repair and eliminate insecurity.

2) the electrical part of the power and the shield is damaged, such as insecurity exists, if it should be excluded.

3) whether winding center clamping mechanism on the positive, otherwise the response is positive.

4) Whether the operator, starting compactors, the following person is not allowed to stand at compactor.

5) hydraulic compactor must check the pressure gauge is within the period of use, the reading is correct, whether hydraulic station is working properly, the hydraulic oil is adequate, or should be ruled out before use.


Automatic winding machine inspection before the operation

 

 

Previous:Lubrication Winder equipment

Next:Winder started when matters must be noted

主站蜘蛛池模板: 倩女还魂在线观看完整版免费 | 无人区乱码区1卡2卡三卡在线 | 欧美折磨另类系列sm | 国产精品成人va在线观看 | 亚洲精品视频一区 | 国产精品理论片在线观看 | 国内外成人在线视频 | 欧美日韩综合网在线观看 | 亚洲AV蜜桃永久无码精品无码网 | 超碰av| 亚洲卡一卡2卡三卡4卡无卡三 | 日本老头4569gay | 香蕉免费一区二区三区在线观看 | 黑人巨摘花第一次出血 | 擦逼视频 | naruto tube18动漫| 国产亚洲视频在线 | 免费精品视频在线 | 男女啪啪gif | 日韩欧美一区二区在线观看 | 67194在线免费观看 | 日本美女视频韩国视频网站免费 | 女人肮脏的交易中文字幕未删减版 | 国产精品思瑞在线观看 | 农村美女沟厕嘘嘘被偷看 | 第一次不是你高清在线观看 | 黄色大片三级 | 成人精品 | 天堂va在线 | 美女脱得一二净无内裤全身的照片 | 每天都要睡男人(nph) | 四虎影视在线观看永久地址 | 国内精品一区二区三区东京 | 日日综合 | 九九国产视频 | 美女把腿开让我 | 成人免费福利网站在线看 | 9久热久爱免费精品视频在线观看 | 精品一区二区三区中文 | 唯美 清纯 另类 亚洲制服 | 四虎国产欧美成人影院 |